Welcome to ZONETH. Your satisfaction is our biggest pursuit.
Current Location:Home > WALL PANEL > Wall Panel Production Line >

Light Weight Concrete EPS Wall Panels Factory

Time:2016-10-20Writer:admin Click: times
Light Weight Concrete EPS Wall Panels Factory

Automatic Cement-Supply System:
Use 2 sets 60-ton cement storage to store cement;the cement storage has up-down level gauge,automatic dust removal system,inside and outside ladders,explosion-proof valve,arch breaker,and other devices.Cement supply is controlled by 2 sets screw conveyors,2 sets cement batching devices,1 set divider and 2 sets butterfly valves.
 
Automatic Sand-Supply System:
the storage and measurement of sand are finished by 5m³ batch hopper;hoisting is realized by 1 set bucket elevator and 1 set sub-feeding device,totally-enclosed feeding to tw mixers respectively.The feeding for storage silo is finished by the user by purchasing forklifts.
 
Automatic Water-Supply System:
2 sets water pumps supply water to two water measuring devices respectively;after reaching the set value,water measuring devices supply water to mixers automatically.The total volume is pre-programmed,and user need to build the water pool.
 
Automatic Foam materials-Supply System:
calculate by volume measuring method,and discharge work is automatically finished by preset program.The body of this system is composed of one 5m³ storage silo,one 1m³ measuring silo and two discharge doors.
 
Automatic Addictives-Supply Syestem:
calculate by volume measuring method,and this system is composed of 2 sets 1m³ storage silos and 2 sets flow control valves,completing automatic material-supply by control system.
 
Automatic Control System:
composed of high-pressure control cabinet,low-voltage control cabinet,display screen,IPC,control sofeware,circuits,air channel.One-key operation allows complete control of the whole procedure.Additional monitoring system can be added at customer’s request.







Production Process:
1.Installing the Calcium silicate board.
2.Cement 、EPS and other additive grouting
.
3.Through the vibration platform to reduce the air bubble.
4.After high temperature forming the panel and take the panel moudle down.
5.Cleaning the panel face and Edge ,make it smooth.
6.Packing the panel.
7.Maintenance the panel.
8.Making final packing before loading.
9.Loading and delivery it to the port.


What service and support you can get from Zoneth?
1.Investment Cost Calculation
2.Factory Layout Design
3.Production Line Layout Design
4.Installation Guidance
5.On-site Training Service
6.Sharing of R&D Achievements

Contact Form

Name:
Email:
Telephone:
Comment:
 
  • http://www.zoneth.com

  • sales@zoneth.com

  • (86)181-7139 7221

  • (86)+27-8387 9988

Add:6th floor, A-1 building,International Business Summit Park Nanniwan Road,Qiaokou District Wuhan Hubei China
Copyright By zoneth. Designed By zoneth.com sitemap